Wind turbines in a field at sunset

Energy project logistics

Energy project logistics – heavy components to site on schedule

Wind power, power grids and power plants – Wiima plans and manages equipment and component deliveries from the factory to the installation site.

What we bring to energy projects

Transport, lifts and documents from one accountable partner – on the terms of the installation schedule.

Deliveries by construction phase

We time deliveries to site readiness and installation order, so the site avoids needless waiting and interim storage.

Out-of-gauge and heavy components

Blades, nacelles, transformers and other out-of-gauge items travel on a planned route, with suitable equipment and the required permits.

Ports and interim storage

We coordinate the port phase, interim storage and onward transport from a single plan.

One contact person

A dedicated contact person handles tendering, bookings, tracking and exceptions.

What makes energy project deliveries demanding?

Dimensions and weights

Components can exceed standard transport dimensions, which calls for route surveys and permits.

Remote sites

Installation sites are often far from ports and good road connections.

Weather and installation windows

Lifts and installation depend on the weather. Deliveries must flex when the installation window changes.

How Wiima supports energy projects

The scope is tailored to each project. It typically includes:

  • Route surveys, transport plans and permits for special transport
  • Sourcing transport and lifting equipment from our partner network
  • Shipping, port handling and interim storage
  • Phasing deliveries to the installation order
  • Documentation and customs coordination
  • Site supervision and on-site coordination when needed
  • CO₂ reporting on a case-by-case basis

A single project is handled with the Project Forwarding model; ongoing control across projects with the Control Tower model.

Project cargo to site

Visibility into deliveries with Projector

Projector is our project logistics management system. It brings shipments, documents and schedules together in one view.

Milestones in view

See delivery milestones and possible delays early, and act before they affect installation.

Critical items highlighted

Critical components are flagged and highlighted so that everyone knows their status.

Discover Projector
  • Koskisen
  • Langh Tech
  • Lamor
  • Kumera
  • FEON
  • Fortum
  • Ponsse
  • Lumene
  • ALMACO
  • Pemamek
  • Tiipa Tiivistepalvelu
  • Mobimar
  • Alfa Laval
  • Skeleton
  • Prysmian
  • GPV
  • LEDiL
  • Mäkinen
  • teampac
  • ISKU
  • Kempower
  • Projecta
  • Metso
  • Normet
  • Paroc (Owens Corning)
  • Wärtsilä
  • Sherwood
  • Viking Line
  • Cimcorp
  • Evac
  • drop.
  • MacGregor
  • Piikkiö Works
  • YES-EU
  • Nokian Tyres
  • Molok
  • Raute
  • Kiilto
  • Nice Trading
  • Oilon
  • Koskisen
  • Langh Tech
  • Lamor
  • Kumera
  • FEON
  • Fortum
  • Ponsse
  • Lumene
  • ALMACO
  • Pemamek
  • Tiipa Tiivistepalvelu
  • Mobimar
  • Alfa Laval
  • Skeleton
  • Prysmian
  • GPV
  • LEDiL
  • Mäkinen
  • teampac
  • ISKU
  • Kempower
  • Projecta
  • Metso
  • Normet
  • Koskisen
  • Langh Tech
  • Lamor
  • Kumera
  • FEON
  • Fortum
  • Ponsse
  • Lumene
  • ALMACO
  • Pemamek
  • Tiipa Tiivistepalvelu
  • Mobimar
  • Alfa Laval
  • Skeleton
  • Prysmian
  • GPV
  • LEDiL
  • Mäkinen
  • teampac
  • ISKU
  • Kempower
  • Projecta
  • Metso
  • Normet

All clients

Ready for better logistics?

Tell us about your energy project – let us plan the deliveries together.

Contact us

Your contact

Mary Liewendahl, Sales Manager, Projects

Mary Liewendahl

Sales Manager, Projects

mary.liewendahl@wiima.fi+358 400 358 069LinkedIn